Power Plant EPC

Pestech is capable of undertaking complete EPC scope for Power Plant with partnership with the following OEM;

HYDRO POWER STATION

Pestech are specialized in Refurbishment/ Modernization of Hydro Power Station for Life Extention. This will include complete replacement or refurbishment of Mechanical, Electro-mechanical, Electrical, Automation, Interconnecting Facility and related works .

WASTE-TO-ENERGY POWER STATION

We have partnered Valmet Technology, a manufacturer of Boilers for the design, supply, install, test, commission and O&M of WTE. These station will also include Pre-treatment system to produce RDF/SRF and Organics waste treatment with Anaerobic Digestors.

WTE power station will require detailed study of the waste composition and moisture content to predict the calorific value (LHV) of the fuel. Pestech with Valmet will be able to undertake the detailed study to ensure maximum power output and continues reliability.