CONTROL SYSTEM UPGRADE AT TNB KENYIR, CAMERON HIGHLAND AND SG. PIAH HYDRO POWER PLANT

PESTECH has secured the first project from TNB Generation, Hydro Unit for
the upgrading of 17 Hydro Turbine Control System for three (3) major sites,
including Kenyir, Cameron Highland and Sg. Piah Hydro Power Plant.
The scope of delivery and implementation includes the following:
• Hydro Power Plant Common Control System
• Hydro Turbine Unit Control System

CONTROL SYSTEM UPGRADE AT TNB KENYIR, CAMERON HIGHLAND AND SG. PIAH HYDRO POWER PLANT
• Hydro Turbine Governor Control System
• Turbine Electro-Hydraulic System
• Synchronizer System
• Generator Protection System
• HMI, Engineering Server and Plant Historian System
• CHGCC Central Control Centre for Cameron Highland
• KGCC Central Control Centre for Kenyir
• IPS/IDS System