Upgrading Of Railway Infrastructure And Systems For Ktmb At Klangvalley Electrified Double Track Area [Systems Works]
This project is for the first phase / 1st package of the overall Klang Valley Double Track Electrification (KDVT) rehabilitation project. KVDT covers approximately 160KM of double track electrified network spanning from Port Klang to Sentul-Batu Caves and Rawang to Seremban. First phase of KDVT rehabilitation is from Rawang to Salak Selatan.
Our scope of work covers condition assessment, rehabilitation, upgrading, replacement, testing and commissioning for system works of the project. The system works consists of Overhead Catenary System (OCS) and Traction Power System (TPS), Signalling System, Modification, integration an upgrading of Centralized Traffic Control (CTC) at KL Sentral and Interface engineering. The project is for a duration of 3 years.