Design, Manufacture, Supply, Delivery, Installation, Testing, and Commissioning, Interfacing, Warranty and Other Related Works of Replacement of Automated People Mover (APM)

 

The proposed project is for the replacement of the existing Track Transit System (TTS), an Automated People Mover (APM) and Associated Works at Kuala Lumpur International Airport (KLIA). The TTS opened in 1998 and consist of two stations, one in the Main Terminal Building and the other in Satellite Building A and serves as the means of transport for passenger between the two terminals. The TTS system comprises a Central Control System, an Automatic Train Operation (ATO) System, a Power Distribution System (PDS) and three APM vehicles. This project involves a like-for-like replacement of all systems in accordance with this scope of works